
Add to Cart
Sinter HIP Furnace With Fast Cooling Molybdenum Processor Low Deviation
Overview
Sinter HIP furnaces with fast cooling are designed to integrate the functions of pressure de-waxing, vacuum de-waxing, vacuum sintering, partial pressure sintering, pressure sintering, atmosphere sintering, fast cooling and etc.
It's mainly use for Cemented Carbide Sintering process.
Feature
1. Stable performance 2. High density of product 3. Rapid cooling
Only 30 minutes is needed to cool down the furnace from 1450°C to 150°C.
Automatic control during whole process
Technical specifications
Model | GN3312F-1 | GN5518F-1 | ||
Operating life | 6000 Furnace run (about 20 years) | |||
Dimension of usable space | 300×300×1200mm | 500×500×1800mm | ||
Max. load weight | 500KG | 1500KG | ||
Power | 320kW | 420 kW | ||
Max. pressure | 1MPa | |||
Max. working pressure | 0.98MPa | |||
Max. working temperature | 1550°C | |||
Temperature control method | 3 zones | |||
High temperature uniformity | ≤±7°C | |||
Paraffin as the binder | Hc deviation | ≤±0.3KA/M | ||
Com deviation | ≤±0.2% | |||
Temperature increasing rate (without loading) | 10°C/min(≤1200°C); | |||
Ultimate vacuum | ≤ 2Pa, tested in cold and clean chamber | |||
Vacuum leak rate | ≤ 2Pa/h, tested in cold and clean chamber | |||
Pumping speed | ≤20 min., pumping to 3Pa in cold and clean chamber | |||
Wax collecting rate | ≥98﹪ | |||
Fast cooling(with loading) | From 1450 °C to 100°C, 30 minutes | From 1450 °C to 100°C, 40 minutes | ||
Temperature measuring | W-Re 5-26 double-core thermocouple | |||
Allowed process gases | Ar, H2, N2, CH4 |