
Add to Cart
Fast Cooling With Low Deviation Molybdenum Processor Sinter HIP Furnace
Overview
It's mainly use for Cemented Carbide Sintering process.
Sinter HIP furnaces with fast cooling are designed to integrate the functions of pressure de-waxing, vacuum de-waxing, vacuum sintering, pressure sintering, partial pressure sintering, atmosphere sintering, fast cooling and etc.
Technical specifications
Model | GN3312F-1 | GN5518F-1 | ||
Operating life | 6000 Furnace run (about 20 years) | |||
Dimension of usable space | 300×300×1200mm | 500×500×1800mm | ||
Max. load weight | 500KG | 1500KG | ||
Power | 320kW | 420 kW | ||
Max. pressure | 1MPa | |||
Max. working pressure | 0.98MPa | |||
Max. working temperature | 1550°C | |||
Temperature control method | 3 zones | |||
High temperature uniformity | ≤±7°C (Ceramic rings) | |||
Paraffin as the binder | Hc deviation | ≤±0.3KA/M | ||
Com deviation | ≤±0.2% | |||
Temperature increasing rate (without loading) | 10°C/min(≤1200°C); 8°C/min(1200-1520°C); | |||
Ultimate vacuum | ≤ 2Pa, tested in cold and clean chamber | |||
Vacuum leak rate | ≤ 2Pa/h, tested in cold and clean chamber | |||
Pumping speed | ≤20 min., pumping to 3Pa in cold and clean chamber | |||
Wax collecting rate | ≥98﹪ (Paraffin as the binder) | |||
Fast cooling(with loading) (cooling water ≤30°C) | From 1450 °C to 100°C, 30 minutes | From 1450 °C to 100°C, 40 minutes | ||
Temperature measuring | W-Re 5-26 double-core thermocouple | |||
Allowed process gases | Ar, H2, N2, CH4 |
Feature
Only 30 minutes is needed to cool down the furnace from 1450°C to 150°C.
Automatic control during whole process
Stable performance 2. High density of product 3. Rapid cooling